Browse Items (2 items total)
Lists of expenses for three different projects at Berry: a 10 inch pipe line, the Redmond Gap Reservoir, and the filter plant.
Hall makes arrangements to come to Berry to receive bids and let contracts for the Redmond Gap Dam.